>Update: Fagioli has commenced assembly on the LR 11350 this morning.
Just got off the phone with a rep from Fagioli Crane of Houston. He indicated the new 1,000 + ton rated Liebherr LR 11350 with 520' of boom and jib will start shipping to Boca Chica within 10 days and will be used to lift the modules of the Integration Tower which is fabricated out of structural steel. Modules will be pre assembled on the ground and lifted into place, expect the landing pad to be the assembly and marshalling area for the truckloads of steel. Fagioli currently has the 1220 crane there as well as 6 SPMT'S and 2 powerpacks and is sending additional SPMT'S and powerpacks to facilitate heavy moves.
Things are going to change dramatically !
Just got off the phone with a rep from Fagioli Crane of Houston. He indicated the new 1,000 + ton rated Liebherr LR 11350 with 520' of boom and jib will start shipping to Boca Chica within 10 days and will be used to lift the modules of the Integration Tower which is fabricated out of structural steel. Modules will be pre assembled on the ground and lifted into place, expect the landing pad to be the assembly and marshalling area for the truckloads of steel. Fagioli currently has the 1220 crane there as well as 6 SPMT'S and 2 powerpacks and is sending additional SPMT'S and powerpacks to facilitate heavy moves.
Things are going to change dramatically !
